SMARTER PORT

CASE STUDIES

TOS replacement at Ningbo-Zhoushan Port's two ten-million-TEU terminals

Ningbo-Zhoushan Port

Using our fully self-developed n-TOS, we replaced the core production operating system at two single container terminals each handling over ten million TEU.

Solution

We designed a phased cutover with multiple rounds of canary testing.

Outcome

The transition between the old and new systems was seamless, with no interruption to terminal operations throughout the year.